City is installing Storm Water Drainage Containment ponds. After that is done a new course has already been designed but will need to finalized. The new course should be done sometime 2023.
Technically diverse, nestled amidst soaring evergreens along the meandering Spokane River in the scenic Downriver area.
Traveling east on I-90, take exit for S. Walnut St. (exit 280). Take a left on S. Walnut St. It will change into N. Maple St. Travel north on Maple St. exit 1.5 miles. Turn left at 7-11 onto Maxwell Ave (becomes Pettit Dr. and then W. Downriver Dr. as you go under bridge) and go 2.3 miles to course on left.