Looking for some help from those that have experience with carpet tees. Any and all input is welcomed!
Shag or berber? Upside down or right side up? How is the carpet held in place?
I've got some 3.5'W x 8'L berber style carpet that I'm going to use in a few flat locations at my home course. I also have some 4'Lx4"x4" pt posts. I was thinking I'd level the posts along the front and back of the tee just above ground level, then spread 1-2" of crush&run6 over a 10'x 6' area, then screw the carpet to the posts and stake it down along the sides.
What are your thoughts on that plan?
Thanks
Shag or berber? Upside down or right side up? How is the carpet held in place?
I've got some 3.5'W x 8'L berber style carpet that I'm going to use in a few flat locations at my home course. I also have some 4'Lx4"x4" pt posts. I was thinking I'd level the posts along the front and back of the tee just above ground level, then spread 1-2" of crush&run6 over a 10'x 6' area, then screw the carpet to the posts and stake it down along the sides.
What are your thoughts on that plan?
Thanks