All,

It's that time once again to pour concrete. Beaver Ranch is once again providing 2014 season disc golf passes to anyone who puts a combined 8 hours into pouring the pads.

The following are the scheduled work days:
Friday, August 23 (afternoon only)
Saturday, August 24
Sunday, August 25
Saturday, August 31
Sunday, Sept 1
Saturday, Sept 7
Sunday, Sept 8

Additionally, the following items are needed:
Gas Generator (this may have been found. Please check with Rudy)
Electric or gas cement mixer
3 or 4 long hoses
Plastic Buckets
Rakes, shovels, picks

If you are able to attend any of the above or provide a generator or cement mixer, please read on below:

Please contact Rudy at 303-838-2777 or [email protected] to RSVP for any of the dates/times above.

Friday afternoon is a setup day. We will be positioning the water and mixers, moving bagged concrete and stone to the top.

Each Saturday and Sunday will be spent pouring the pads. Mixers and product will be moved from tee pad to tee pad.

We'll need a lunch runner each day at 11:30. Subway is close.

Work crews will be there to assist on Saturday's and Sunday's. Additional finishing equipment will be supplied.

Thanks,
Rudy
303-838-2777
[email protected]
 
This past weekend, 4 more tee pads were poured. Thanks to Rudy and the clubs support, we will soon have new concrete tee pads for holes 14, 18, and 21 (long and short).

Having said that, there's still much work that needs to be done. Work a full day or 8 hours total and Beaver Ranch will supply you with a season's pass for the 2014 season!!

Rudy is looking for 5 helpers for each of the following days:

Saturday, August 31
Sunday, Sept 1
Saturday, Sept 7
Sunday, Sept 8

Additionally, the following items are needed:

Electric or gas cement mixer

If you are able to attend any of the above or provide a generator or cement mixer, please read on below:

Please contact Rudy at 303-838-2777 or [email protected] to RSVP for any of the dates/times above.

Each Saturday and Sunday will be spent pouring the pads. Mixers and product will be moved from tee pad to tee pad.

Work crews will be there to assist on Saturday's and Sunday's. Additional finishing equipment will be supplied.

Please RSVP with the information below.

Thanks,
Rudy
303-838-2777
[email protected]
 