So work has resumed on V 3.0. This will be far less than a complete rebuild like it was for v 2.0. I have a launch coming up this weekend and while the weather looks a little iffy I'm going to try to get 'er done.
The first photo shows the chute tube with the piston that holds the chute and cord in. The top of the piston should be level with the top of the tube but it is REALLY jammed down in there. Thats the first thing that has to be fixed. The second photo show the damage to the lower basket.
The first photo shows the chute tube with the piston that holds the chute and cord in. The top of the piston should be level with the top of the tube but it is REALLY jammed down in there. Thats the first thing that has to be fixed. The second photo show the damage to the lower basket.